
Construction of a LEED Gold-certified industrial building with Tilt-Up concrete walls, a steel structure and steel decking. The project has a clear height of 32 ft and 60 x 40 ft bays. It also includes 5 loading docks, with provision for 4 additional docks in the future, and restrooms.
Tijuana, Baja California
01 / 04

01 / 04 · 3D tour
Site, structure, walls and roof rise in the real order of construction.
Loading 3D model…