
Construction of a LEED-certified industrial building with Tilt-Up concrete walls and a steel structure. The project has two mezzanines, a clear height of 40 ft and 56 x 39 ft bays. It also includes 11 loading docks, with provision for 3 additional docks in the future.
Mexico City, CDMX
01 / 10

01 / 04 · 3D tour
Site, structure, walls and roof rise in the real order of construction.
Loading 3D model…